Small details.
A controlled production brief.
Our factory in Xiong County (Xiongxian), Hebei, China supports waterproofing tape and corner projects. Start with the assembly you need to qualify, then agree materials, samples, inspection and packing.

Material. Geometry.
Inspection. Packing.
Generated scenes explain the review topics; they are not photographs of our facility, records of available machinery or evidence of a test result.




From system brief
to release record.
The sequence below is a project planning framework. Exact machinery, internal and outside responsibilities, test methods and tolerances are confirmed for the chosen product.
- 01
Define the waterproofing assembly
Identify the membrane or mortar, substrate, joint detail and intended use. Select mesh or nonwoven-fleece edges and define the flexible center, finished width, roll length and corner geometry.
Evidence to agreeA versioned specification with the membrane TDS and open compatibility questions.
- 02
Confirm materials & production route
Review the proposed flexible-core and textile structure, color, tolerances and joining requirements. Confirm the applicable material preparation, combining and forming route, including any specialist outside process.
Evidence to agreeWritten material identification and process allocation for the selected product.
- 03
Make & evaluate compatibility samples
Evaluate wet-out, embedment, bond, finished build-up and corner fit with the exact proposed membrane. Agree the test method, conditioning and acceptance criteria; a loose tape sample cannot prove the performance of a complete system.
Evidence to agreeNamed samples, evaluation conditions and agreed results before specification approval.
- 04
Control roll & corner dimensions
Check the specified width, length, thickness, textile alignment, edges and visible defects. For preformed corners, check orientation and dimensions against the approved drawing. Agree the measurement method and frequency for the order.
Evidence to agreeOrder-specific dimensional and visual inspection records.
- 05
Inspect, identify & pack
Review finished units against the approved sample, record the production lot identification, and confirm roll labels, corner counts, private-label artwork and packaging protection.
Evidence to agreeInspection status, approved artwork and packing specification.
- 06
Confirm release & shipment data
Count rolls or pieces per carton and confirm actual carton dimensions, gross weight and shipment terms. Resolve open inspection points before release; price, freight and delivery timing need a current written quotation.
Evidence to agreePacking list, lot references and agreed release documentation.
A tape sample is not
a system approval.
A waterproofing detail depends on the tape, membrane or mortar, substrate, application and curing conditions. Ask for test evidence relevant to that combination, not a general promise based on product appearance.
Agree who performs each evaluation, which method applies and how the result will be recorded. Certification, service exposure and performance claims require exact-scope evidence.
Read the installation concept guideQuestions before you order.
Where is the FEICHEER factory?
Our factory is in Xiong County (Xiongxian), Hebei, China. Request the visit address, appointment and product-specific process discussion before travelling. No street address or live capacity figure is published here.
Is every production process carried out in-house?
We have our own factory. The exact material preparation, combining, forming and finishing route is confirmed for each product. Any specialist outside work is identified for the order; this page does not claim that all raw materials, equipment or processes are owned in-house.
Can you provide genuine factory photographs or a verification call?
Genuine factory photographs are not yet published on this page. Ask us to arrange current, product-relevant process evidence or an appointment for a verification call. The visible production image is AI-generated and does not document our actual premises, machines or production output.
Are these self-adhesive repair tapes?
No. The website covers non-self-adhesive waterproofing bands and preformed corners intended to be embedded in a compatible membrane or mortar. The exact assembly and application method require confirmation; do not use the category name as a suitability guarantee.
What testing or certification can a buyer rely on?
Specify the destination market, product, membrane and required standard. Any available test report or certificate must match its actual product or assembly scope. We do not advertise blanket system approval, waterproofing performance ratings or certification based on an illustration.
How do sampling, MOQ and private-label packing work?
Send structure, dimensions, membrane details, expected quantity, artwork and destination. We confirm sample availability and cost, production minimum, packaging and timing in writing. The inquiry is a request for review, not an order or a payment instruction.
Bring the system details.
Structure + dimensions + membrane + quantity + destination.