Concept install guide

Embed the band as part of the system.

This is a qualification and communication guide, not a substitute for the waterproofing-system manufacturer's instructions or project specification.

Change of plane

Coating. Band. System coat.

The band is non-self-adhesive. Its textile edge must be integrated using a compatible waterproofing material or setting system.

Concept detail only. Final overlap, coat thickness, curing and compatibility follow the selected waterproofing-system instructions.
Six-step concept

A clear sequence for buyer discussion.

Exact overlaps, film thickness, tools and cure times remain controlled by the complete waterproofing system and project requirements.

Confirm the system

Use the waterproofing-material supplier's instructions. Confirm the substrate, primer, membrane or mortar chemistry, coat thickness and curing conditions.

Prepare the detail

The substrate should meet the selected system's requirements. Resolve dust, contamination, sharp edges, voids and unsupported movement before band placement.

Apply the receiving coat

Place the compatible waterproofing material along the joint at the width and thickness required by the system owner.

Embed without voids

Position the band and work the textile edges into the fresh coat without folds, trapped air or an unintended bridge across the detail.

Join and preform

Follow the system-defined overlap. Use matched preformed inside/outside corners where the geometry benefits from a pre-shaped detail.

Complete and verify

Apply the remaining system layers as specified. Respect cure time and perform the project-required inspection or assembly test before covering.

Do not mix unverified systems

Compatibility with one liquid membrane, mortar or adhesive does not prove compatibility with all chemistries. Request an exact-system sample and evidence review.

Send the membrane TDS with the feasibility request.

That single document makes the first supplier review far more useful.